Description
Performed a phase II investigation of the site, discovered a UST that needed to be closed. Tested the soil for contaminants and resulted in 10,000 tons of gasoline contaminated soil excavated and processed through waste management. Site was backfilled with certified clean grade soil.
Project details
- Client: Wawa/J&J Development
- Location: Brooklawn, NJ
- Category: UST Closure, Excavation, Waste Management, Phase II Investigation